MEA called and confirmed that we have power and phone to the hut! Now, MTA has to turn on the DSL. We will have Barix boxes at the studio and the site to send the signal from the studio to the site and thence out on the airwaves. The Barix boxes are in transit. The broadcast engineer is scheduled to come out on Saturday to hook up the antenna.